Excitation System Replacement, Greers Ferry Dam
Response date passed Level 1 (Self) Solicitation
CMMC requirement
- Level
- Level 1 (Self)
- How detected
- DFARS 252.204-7021 clause cited in descriptionCMMC wording detected in description
Excerpt from the SAM.gov notice description:
…ires the contractor and/or subcontractor(s) information system to process, store, or transmit Federal Contract Information (FCI), and requires the contractor and/or subcontractor(s) to comply with CMMC requirements. The CMMC level required by this solicitation is: CMMC Level 1 (Self). This CMMC level, or higher (see 32 CFR part 170), is required prior to award for each contractor information system that will process, store, or transmit FCI during performance of the contract. In accordance with 252.2…
Detection is automated and reads only the notice description in SAM.gov's bulk file, not attachments. Confirm the requirement in the solicitation documents.
Notice description
Show description text (first 6,000 characters)
Amendment 0002: Please see the attached SF30 for amendment details. Amendment 0001: Please see the attached SF30 for amendment details. Solicitation: W9127S26RA071, Excitation System Replacement, Greers Ferry Dam, Little Red River, Cleburne County Arkansas for The U.S. Army Corp of Engineers (USACE) Little Rock District (SWL). This notice is related to Pre-Solicitation Notice, W9127S26RA056. W9127S26RA071, Excitation System Replacement, Greers Ferry Dam, is being advertised as a competitive total Small Business Set Aside under the North American Industrial Classification System (NAICS) Code 335312 - Motor and Generator Manufacturing. The Small Business Size Standard is set at 1,250 employees. This solicitation is being issued utilizing Revolutionary FAR Overhaul (RFO) Parts 12 and 15 as a Request for Proposals (RFP). Proposals will be evaluated via the Best Value - Trade Off method and will result in a firm-fixed price construction contract. The Magnitude of Construction is between $1M and $5M. Work shall be complete within 365 calendar days. Amendments to the solicitation will be issued via PIEE/GPE. It is each offerors responsibility to download the solicitation and monitor the sites for updates. Offerors must be registered with the System for Award Management (SAM) in order to submit a proposal in response to this solicitation. Contractors may register for SAM at no cost to them at the following website: www.sam.gov. This solicitation requires the contractor and/or subcontractor(s) information system to process, store, or transmit Federal Contract Information (FCI), and requires the contractor and/or subcontractor(s) to comply with CMMC requirements. The CMMC level required by this solicitation is: CMMC Level 1 (Self). This CMMC level, or higher (see 32 CFR part 170), is required prior to award for each contractor information system that will process, store, or transmit FCI during performance of the contract. In accordance with 252.204-7021 Compliance with the Cybersecurity Maturity Model Certification Level Requirements, contractors shall submit the CMMC UID(s) issued by SPRS for contractor information systems that will process, store, or transmit FCI or CUI during performance of the contract.
- Response due
- Sep 25, 2026, 2:00 PM EDT
- Posted
- Aug 25, 2026
- Solicitation #
- W9127S26RA071
- Agency
- Dept of the Army
- Office
- W076 Endist Little Rock
- NAICS
- 335312
- PSC
- Z2MD
- Set-aside
- Small Business Set Aside - Total
- Place of perf.
- —
- Notice ID
- 0ac62172a5964ffaa401082f8f7cb590
- First seen
- Oct 18, 2026
More open Army CMMC notices
John Day Dam Powerhouse HVAC Upgrades
Level 2 (Self) · due —
John Day Dam Powerhouse HVAC Upgrades
Level 2 (Self) · due —
Bonneville Powerhouse II Unwatering Pump Replacement
Level 1 (Self) · due —
Bonneville Powerhouse II Unwatering Pump Replacement
Level 1 (Self) · due —
John Day Dam Powerhouse HVAC Upgrades
Level 2 (Self) · due —
John Day Dam Powerhouse HVAC Upgrades
Level 2 (Self) · due —
Get the weekly CMMC solicitation digest
New Department of War (DoW) solicitations that require CMMC, grouped by level and agency. Free. One email a week once we launch.